skip to main content

Branches:
»   Leeds
»   London
»   Glasgow

Tel:
+44(0)870 850 0860

Head Office:
ACS Stainless Steel Fixings Ltd
Cross Green Approach
Cross Green Industrial Park
Leeds
LS9 0SG



Print E-mail

Type 3B

Type 3BThis system is used where a soldier course is beneath the supported masonry and the system needs to be hidden from below. The soldier course is supported via a welded stirrup; stitching rods are then inserted in fully mortared brick cores between the stirrups.